Chegongzhuang station
Line 2 platform | ||||||||||||
General information | ||||||||||||
Location | West 2nd Ring Road and Chegongzhuang Street (车公庄大街) / Ping'anli West Street (平安里西大街) Chegongzhuang [zh], Xicheng District, Beijing China | |||||||||||
Coordinates | 39°55′56.45′′N 116°21′20.62′′E / 39.9323472°N 116.3557278°E / 39.9323472; 116.3557278 | |||||||||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited | |||||||||||
Line(s) | ||||||||||||
Platforms | 4 (1 split island platform and 1 island platform) | |||||||||||
Tracks | 4 | |||||||||||
Construction | ||||||||||||
Structure type | Underground | |||||||||||
Accessible | Yes | |||||||||||
Other information | ||||||||||||
Station code | 202 (line 2) | |||||||||||
History | ||||||||||||
Opened | September 20, 1984; 40 years ago (1984年09月20日) (line 2) December 30, 2012; 12 years ago (2012年12月30日) (line 6) | |||||||||||
Services | ||||||||||||
| ||||||||||||
|
Chegongzhuang station (simplified Chinese: 车公庄站; traditional Chinese: 車公莊站; pinyin: Chēgōngzhuāng Zhàn) is an interchange station on Line 2 and Line 6 of the Beijing Subway.[1] The station is on intersection of Chegongzhuang Street and the West 2nd Ring Road. It provides direct access to Guanyuan Park.
Station layout
[edit ]Both the line 2 and 6 stations have underground island platforms. Line 6 has a split island platform, whilst line 2 has a normal island platform.
Exits
[edit ]There are 5 exits, lettered A, B, C, E, and H. Exits C and H are accessible.[2] [3]
Future Development
[edit ]It will be the Southern terminus of Line 13A. Construction of Chegongzhuang station on Line 13A started on 20 April 2024.[4]
Gallery
[edit ]-
Line 2 platform
-
Line 2 platform in May 2010
-
Line 2 platform
-
Line 2 platform in December 2020
-
Stairs to exit C
-
Line 2 exit
-
Interchange to Line 6.
-
Passengers boarding a westbound line 6 train
-
Line 6 concourse
-
Line 6 platform
-
Eastbound line 6 platform
-
Eastbound line 6 platform with escalator to exits A, E, and H to the right
-
Eastbound line 6 platform in November 2016
-
Line 6 concourse
-
Line 6 train at Chegongzhuang station
-
Westbound line 6 platform facing east
-
Corridor to the eastbound line 6 platform
Notes
[edit ]- ^ a b "JPG格式线路图下载 北京地铁官方网站". Archived from the original on 2022年12月31日.
- ^ "车公庄站(6号线)".
- ^ "车公庄站(2号线)".
- ^ "中铁十六局集团一周要闻(2024年4月15日-4.21)". 2024年04月22日. Archived from the original on 2024年06月11日.
4月20日,地铁公司承建的北京轨道交通扩能提升工程13号线01标项目正式破土动工,标志着该工程进入实质性施工阶段
This article related to the Beijing Subway is a stub. You can help Wikipedia by expanding it.