Changgang station
Appearance
From Wikipedia, the free encyclopedia
This is the current revision of this page, as edited by 149.108.209.38 (talk) at 13:22, 11 February 2025. The present address (URL) is a permanent link to this version.Revision as of 13:22, 11 February 2025 by 149.108.209.38 (talk)
Guangzhou Metro interchange station
Changgang 昌岗 | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Platform 3 (Line 8 towards Jiaoxin) | |||||||||||||
Chinese name | |||||||||||||
Simplified Chinese | 昌岗站 | ||||||||||||
Traditional Chinese | 昌崗站 | ||||||||||||
| |||||||||||||
General information | |||||||||||||
Location | Haizhu District, Guangzhou, Guangdong China | ||||||||||||
Operated by | Guangzhou Metro Co. Ltd. | ||||||||||||
Line(s) | |||||||||||||
Platforms | 4 (2 island platforms) | ||||||||||||
Tracks | 4 | ||||||||||||
Construction | |||||||||||||
Structure type | Underground | ||||||||||||
Accessible | Yes | ||||||||||||
Other information | |||||||||||||
Station code | 209 819 | ||||||||||||
History | |||||||||||||
Opened | 25 September 2010; 14 years ago (2010年09月25日) | ||||||||||||
Services | |||||||||||||
| |||||||||||||
Changgang Station (simplified Chinese: 昌岗站; traditional Chinese: 昌崗站; Jyutping: coeng1 gong1 zaam6; Cantonese Yale: Chēunggōng Jaahm) is an interchange station of Line 2 and Line 8 on the Guangzhou Metro. The underground station is located at the intersection of Changgang Road[1] and Jiangnan Avenue[2] in Haizhu District. It started operation on 25 September 2010.[3]
At its first operation day of the station, the number of passenger frequency was over 220,000, so traffic control was needed at the platforms of Line 2.[4]
Station layout
[edit ] G
-
Exits A, B, C1, C2, D-F
L1
Reserved Zone - Reserved for Civil Works
Reserved Zone - Reserved for Civil Works
L2
Concourse Lobby Ticket Machines, Customer Service, Shops, Police Station, Safety Facilities
Concourse Lobby Ticket Machines, Customer Service, Shops, Police Station, Safety Facilities
Pedestrian subway
Island Platform, doors will open on the left
Island Platform, doors will open on the left
Gallery
[edit ]-
Line 8 concourse
-
Line 2 concourse
-
Transfer stairs
-
Exit A
-
Exit E
-
Exit F
References
[edit ]- ^ simplified Chinese: 昌岗路; traditional Chinese: 昌崗路; pinyin: Chānggǎng Lù; Jyutping: coeng1 gong1 lou6
- ^ 江南大道; Jiāngnán Dàdào; gong1 naam4 daai6 dou6
- ^ Guangzhou Metro New Line 2 and Line 8 Opened on Sept 25th Archived September 28, 2010, at the Wayback Machine
- ^ 地鐵三條新線今開通 22萬客流"逼爆"昌崗站 (in Simplified Chinese). Archived from the original on 2011年07月18日. Retrieved 2010年10月07日.
23°05′24′′N 113°16′42′′E / 23.089878°N 113.278356°E / 23.089878; 113.278356