glide path

(redirected from glide paths)
Also found in: Thesaurus, Encyclopedia.

glide path

n.
The path of descent of an aircraft, delineated by a radio beam that directs the pilot in landing the craft.
American Heritage® Dictionary of the English Language, Fifth Edition. Copyright © 2016 by Houghton Mifflin Harcourt Publishing Company. Published by Houghton Mifflin Harcourt Publishing Company. All rights reserved.

glide path

or glide slope
n
1. (Aeronautics) the approach path of an aircraft when landing, usually defined by a radar beam
Collins English Dictionary – Complete and Unabridged, 12th Edition 2014 © HarperCollins Publishers 1991, 1994, 1998, 2000, 2003, 2006, 2007, 2009, 2011, 2014
ThesaurusAntonymsRelated WordsSynonymsLegend:
Noun 1. [画像:glide path - the final path followed by an aircraft as it is landing]glide path - the final path followed by an aircraft as it is landing
air lane, skyway, airway, flight path - a designated route followed by airplanes in flying from one airport to another
approach pattern, traffic pattern, pattern - the path that is prescribed for an airplane that is preparing to land at an airport; "the traffic patterns around O'Hare are very crowded"; "they stayed in the pattern until the fog lifted"
Based on WordNet 3.0, Farlex clipart collection. © 2003-2012 Princeton University, Farlex Inc.
Translations
radioalignement de descente

glide path

n (Aer) → sentiero di avvicinamento
Collins Italian Dictionary 1st Edition © HarperCollins Publishers 1995
References in periodicals archive ?
"Because the rate move happened just at the end of the year, sponsors are still evaluating where they are on their glide paths," says Ankit Agarwal, a quantitative research analyst at Loomis, Sayles & Co., in Boston.
Many other TDFs, though, continue on their glide paths by reducing equity exposure for another 5,10, 15 years and sometimes even longer.
Over the years, this has resulted in changing the risk profile of the BlackRock target-date fund's glide paths. "In 1993, we had a landing point of 20% to equities.
The funds' glide paths, underlying funds and targeted asset allocation are the same.
Authors Robert Arnott, Katrina Sherrerd, and Lillian Wu of California-based Research Affiliates point to four "basic design flaws" that they say prevent glide paths from achieving their goals: "1) inefficient asset class exposure, 2) mis-specification of risk and return, 3) poor diversification, and 4) constant risk premium assumptions." These researchers, like many others, make the case that with booming enrollment in defined contribution (DC) schemes, the time has come for a more sophisticated strategy-one that holds up in theory and in practice.
It's really two distinct glide paths. At some point, they will run into each other, but off-the-shelf TDFs did not meet both of those needs."
Maximize Returns / Minimize Volatility: More than one-third (35%) of 401(k) consultants say the most important objective when evaluating target-date fund (TDF) glide paths should be to maximize asset returns while minimizing volatility, a PIMCO survey found.
Glide paths have become prevalent, says Levell, and can provide a middle ground for boards divided on taking a bold action toward bonds.

Full browser ?