This 2002 photo shows the northbound Garden State Parkway at EXIT 153 (NJ 3) in Clifton. (Photo by Jim K. Georges.)
PLANNING THE PARKWAY: In 1945, the New Jersey State Legislature passed legislation enabling construction of the 164-mile-long NJ 4 Parkway. The parkway, which was to connect northern New Jersey with resort areas on the Atlantic coast, was proposed in response to growing congestion on major north-south routes such as US 1, US 9 and NJ 35.
Early designs for the parkway from the New Jersey State Highway Department were divided into three units: 1) the "metropolitan section," extending from existing NJ 4 in Paramus through Passaic, Essex, Union and Middlesex Counties to the Raritan River; 2) the "shore section," from the Raritan River through Middlesex, Monmouth, Ocean, Burlington, Atlantic and Cape May Counties; and 3) the unbuilt "Cross-State Parkway Extension" that would have been located in Middlesex, Somerset, and Mercer Counties. The NJ 4 Parkway was to have been financed out of annual appropriations for highway building.
With only 18 miles of parkway completed by 1950, financing the remainder of the parkway had become difficult, but officials soon came up with another plan modeled on the successful New Jersey Turnpike. On April 14, 1952, the State Legislature enacted legislation to create the New Jersey Highway Authority, which was to construct, operate and maintain a self-sufficient toll parkway from Paramus to Cape May. Orrie de Nooyer was appointed as the first executive director of the New Jersey Highway Authority. The 1952 legislation also called for the appointment of eight non-salaried commissioners to oversee the project. This legislation also gave the project a new name: the Garden State Parkway.
Following the success established by the New Jersey Turnpike Authority, the New Jersey Highway Authority adopted the power to issue bonds to finance construction of the Garden State Parkway. The payment of interest and principal on the bonds would be covered by tolls, concessions and other income. Swift construction of the parkway would enable the Highway Authority to cover interest expenses, which began accruing the moment that the 305ドル million in construction bonds were issued in 1952. More than 41ドル million was allocated for right-of-way acquisition.
This 1955 postcard shows the Garden State Parkway near Atlantic City. (Postcard supplied by Bryan Katz.)
DESIGN CRITERIA: Gilmore Clarke, the landscape architect and engineer who worked with Robert Moses on the New York-area parkways, designed the Garden State Parkway. Clarke's design for the parkway was a hybrid of the "Pennsylvania Turnpike" model that stressed efficiency and the "Merritt Parkway" model that stressed aesthetic beauty.
Building upon the parkway guidelines outlined in the 1935 "Regulations and Procedures," the following principles governed the design of the Garden State Parkway:
The roadway was designed for safety, comfort and speed. The surface treatment is paved and regular. Acceleration and deceleration lanes are provided for entrances, exits, and service facilities in order to smooth traffic flow. The unobstructed, sloping, stabilized shoulders allow drivers of disabled cars to pull off the roadway. "Singing" shoulders, better known as "rumble strips," alert motorists straying from the roadway. The earth moving undertaken during construction of the roadway provided an opportunity to plan for safety features.
In northern New Jersey, the "metropolitan section" of the parkway serves as a functional commuter highway and does not appear different from the expressways built in the 1950's. It follows a gradually curving route through densely populated urban and suburban areas. North of Paramus, the dual roadways follow the rolling terrain, and the parkway is separated from the communities by a wooded buffer. Wide grass and wooden medians indigenous to the Northeast separate the two roadways. From Paramus south to Cranford, the dual roadways are mostly located in a cut, with intersecting roadways and pedestrian walkways carried over the parkway cut. Earthen berms and concrete retaining walls form the walls of the cut. The narrow grass medians contain only guardrails. (Through Bloomfield and Cranford, the parkway itself is carried above the towns.) South of Cranford, the rolling terrain and wooded buffers return.
Moving south of the Raritan River, the "shore section" of the parkway takes on a more bucolic nature. Paralleling US 9, the parkway first follows the Raritan Bay shoreline, then the Atlantic Ocean shoreline, as it makes its way south toward Cape May. Along some stretches, the parkway passes through unspoiled pine barrens with forested medians as wide as 600 feet. Where the opposing lanes converge to as little as 30 feet, landscaped berms block the view of opposing traffic, eliminating the blinding effects of opposing headlights.
The curvature and grade of the roadway vary in response to local conditions. Throughout the length of the Parkway, steep grades and vertical curves have been eliminated; most grades have a maximum of three percent. The horizontal alignment consists of gentle curves and straight-aways are minimized. The right-of-way for the parkway ranged from 150 feet to 1,200 feet.
The most common bridge type over the length of the Garden State Parkway is the steel-span bridge, of which there are approximately 320. The streamlined design of these bridges is closer to the simpler, utilitarian designs that would become common in postwar expressways. Less common are the approximately 100 concrete girder-and-beam and 25 concrete elliptical arch bridges, all of which were constructed in the 1940's by the New Jersey State Highway Department for the NJ 4 Parkway.
Buildings for service areas, police barracks and toll plaza administration facilities were a one-story domestic design that was compatible with the "New Jersey Colonial" design. These buildings were of either brick or wood frame construction.
This 1960 photo shows the Garden State Parkway at EXIT 136 (Centennial Avenue) in Cranford. Note how the stone-arch overpass design borrows from the New York parkways designed by Robert Moses. (Photo by New Jersey State Highway Department.)
PARKWAY CONSTRUCTION: Under State Highway Commissioner Spencer Miller, Jr., construction of the original NJ 4 Parkway began in 1946 in Clark Township, Union County. Progress was slow: by 1950, only 18 miles of the toll-free parkway had been completed as follows:
With new financing backing from the New Jersey Highway Authority, ground was broken for construction of the Garden State Parkway on July 2, 1952. During 1954, one section after another was opened to traffic in time for the summer tourist season. By August of that year, some 80 miles of parkway were opened, providing uninterrupted travel between Irvington and Manahawkin, including the Raritan River Bridge. By late October, the parkway had been completed all the way south to Cape May.
On July 1, 1955, Governor Robert B. Meyner became the first person to cross the Paramus toll plaza, effectively opening the 165 miles of the parkway from Cape May to Paramus. (For the first year, motorists were detoured around Great Egg Harbor while the 1.2-mile-long parkway bridge awaited completion.) The opening of the parkway soon created demand for a new ocean-going ferry service connecting the southern terminus of the parkway in Cape May with Lewes, Delaware.
The opening of the Garden State Parkway at Paramus created bottlenecks for two years on NJ 17 between the northern terminus of the parkway and the New York State Thruway in Rockland County. On August 25, 1957, a 12-mile-long, 21ドル.3 million extension of the parkway between these two points opened to traffic, ending the bottleneck along NJ 17.
This mid-1960's aerial view shows the Garden State Parkway in northern New Jersey. (Postcard supplied by Bryan Katz.)
THE PARKWAY GROWS OVER THE YEARS: Over the 45 years, additional bonds issued by the New Jersey Highway Authority have helped finance expansion projects on the Garden State Parkway. In central New Jersey, the original four-lane parkway has been widened to as much as 14 lanes. Like the New Jersey Turnpike, the Garden State Parkway makes use of the dual-dual arrangement in the 12-lane and 14-lane sections.
In 1980, the New Jersey Highway Authority constructed the first two high-occupancy vehicle (HOV) lanes in the state along the Garden State Parkway. Two years later, after acknowledging that the lanes did not reduce congestion, but rather caused confusion that created a safety hazard, Governor Thomas Kean and transportation commissioner John Sheridan scrapped the HOV lanes. The former HOV lanes were converted to general-use lanes.
In 1987, the New Jersey Highway Authority purchased the approximately 19 miles of parkway that had been constructed by the New Jersey State Highway Department (now New Jersey Department of Transportation). These three toll-free sections are located in Cape May County (between EXIT 6 and EXIT 12), Ocean County (between EXIT 80 and EXIT 83) and Middlesex and Union counties (between EXIT 129 and EXIT 140). The NJDOT sold the sections for one dollar on the premise that tolls would never be charged on them.
In 1999, officials closed the southbound bridge over Great Egg Harbor after engineers found cracks. The cracks appeared on the original bridge dating from the mid-1950's, which originally carried one lane of traffic in each direction until it was joined by a new two-lane bridge in 1972. The older bridge had less concrete and fewer expansion joints than the new northbound bridge, and this may have contributed to fatigue on the older bridge. Officials shifted traffic onto the northbound bridge while work continued. The emergency construction work was completed within weeks.
In July 2003, the New Jersey Turnpike Authority assumed control of the Garden State Parkway from the New Jersey Highway Authority. The Turnpike Authority maintains all 172.5 miles of the parkway, including the original 32 miles of parkway constructed by the state.
This 2001 photo shows the southbound Garden State Parkway at EXIT 81 (Lakehurst Road) in Toms River. (Photo by Steve Anderson.)
THE PARKWAY TODAY: The Turnpike Authority operates nine full service areas along the parkway at Montvale, Brookdale North, Brookdale South, Vauxhall, Cheesequake, Monmouth, Forked River, Atlantic City and Ocean View. There are also four fuel-only stations and five picnic areas. In addition, there are more than 3,600 parking spaces at 17 commuter park-and-ride locations. The Turnpike Authority also operates the PNC Bank-Garden State Arts Center, a 5,100-seat amphitheater located at EXIT 116 in Holmdel. The Holmdel-based Troop E of the New Jersey State Police patrols the parkway.
Trucks weighing more than 7,000 pounds are prohibited north of EXIT 105 (NJ 18-NJ 35-NJ 36) in Eatontown, although buses are permitted on the entire length of the parkway. Motorcycles have been permitted on the parkway only since the mid-1970's.
The speed limit on the Garden State Parkway is 65 MPH from milepost 27 north to milepost 80 and from milepost 163 north to the New Jersey-New York border. Elsewhere, the maximum posted speed limit is 55 MPH (with the exception of the Driscoll Bridge, where the posted speed limit is 45 MPH). In 2008, the state lowered the speed limit back to 55 MPH from milepost 80 north to milepost 100 following a string of fatal accidents; this section has substandard 11-foot-wide lanes.
TOLLS ON THE PARKWAY: Unlike the New Jersey Turnpike, where interchanges were kept to a minimum, the Garden State Parkway has a total of 305 entrances and exits for convenient access. Unlike the turnpike, which charges tolls only at interchanges, the parkway has eleven barrier tolls at the following locations: Cape May, Great Egg, New Gretna, Barnegat, Toms River, Asbury Park, Raritan, Union, Essex, Bergen and Hillsdale. In addition, the parkway has entrance and exit tolls at 19 locations. The first EZ-Pass tags were accepted at the Hillsdale toll plaza in December 1999, and one year later, the installation of the EZ-Pass system was completed on the parkway.
The frequency of the toll plazas, currently a source of misery for parkway motorists, was extolled in the 1950's by the designers of the parkway as follows:
Parkway engineers have proven that this wicket toll system is for the motorists own good. One criticism of today's expressways is the tedium and hypertension they create within the driver. A short "break" en route, every twenty miles or so, relieves the monotony and removes the cause of many accidents.
All of the cash toll plazas operate on an "honor system" in which motorists who do not have the 25-cent or 35-cent exact change may submit an envelope with the coins and mail it later to the New Jersey Highway Authority. Over the years, this system has proven ineffective: in any given year, only about four percent of all envelopes are returned, translating into a loss of more than 125,000ドル per year in 25-cent tolls.
In 1999, two separate proposals to radically change the toll structure of the Garden State Parkway were presented. State Assemblyman Alex DeCroce (R-Morris County) proposes cutting the number of mainline toll plazas from eleven to six, and charging 1ドル.00 at each plaza. State Senator Robert Martin (R-Morris County) plans to cut the number of mainline toll plazas down to three, and charge 1ドル.00 at each plaza and parkway entrance.
In 2001, acting Governor Donald DiFrancesco asked NJDOT chairman James Weinstein to develop a long-term plan to remove all the toll barriers on the parkway by 2012. Although it received strong support from state leaders, the plan to eliminate tolls eventually was criticized by bondholders, who considered the move as politically motivated and financially irresponsible, as well as by members of the toll collectors' union, who feared losing their jobs.
In January 2004, the New Jersey Turnpike Authority opened new high-speed EZ-Pass lanes at the Pascack Valley toll plaza as part of a 40ドル million project to install new EZ-Pass lanes on the parkway. During the following two and one-half years, the authority upgraded all of its toll plazas, completing the project in mid-2006. The rebuilt plazas, which formerly collected tolls in both directions, were reconfigured as follows:
This 1999 photo shows the Garden State Parkway, looking south from the EXIT 165 (Oradell Avenue) overpass in Paramus. (Photo by Steve Anderson.)
LANE CONFIGURATIONS: Chris Blaney, New Jersey contributor to misc.transport.road, nycroads.com and phillyroads.com, provided the following lane configurations along the Garden State Parkway:
This 2006 photo shows the southbound, quad-carriageway Garden State Parkway at EXIT 117 (NJ 35-NJ 36) in Keyport. (Photo by Laura Siggia Anderson.)
IMPROVEMENTS PLANNED FOR THE PARKWAY: During the early-to-mid 2000's, the New Jersey Highway Authority (and later the New Jersey Turnpike Authority) announced more than 800ドル million worth of improvements to the Garden State Parkway. Some highlights of the long-term improvement plan, which is scheduled for completion in 2012, are listed as follows:
This 2001 photo shows the southbound Garden State Parkway at EXIT 130 (US 1) in Woodbridge. (Photo by Chris Mason.)
This 1998 photo shows the Scotland Hill Road overpass spanning the Garden State Parkway Extension in Spring Valley, Rockland County. (Photo by Steve Anderson.)
CONNECTING TO THE THRUWAY: The Garden State Parkway Extension extends 2.4 miles from the New Jersey-New York border north to the New York State Thruway (I-87 / I-287) in Rockland County. Operated by the New York State Thruway Authority, the "extension" has a southbound exit and a northbound entrance at Schoolhouse Road in Chestnut Ridge, and ends with a "trumpet" interchange at the Thruway in Spring Valley. The New York State section of the Garden State Parkway, which is open only to passenger cars, has no toll.
The Rockland County portion was part of a 12-mile northern extension of the Garden State Parkway through northern Bergen County. The entire length of the extension between NJ 17 in Paramus and the New York State Thruway was 21ドル.3 million, 17ドル.0 million of which was borne by the New Jersey Highway Authority and the remainder by the New York State Thruway Authority. After months of delay caused by labor disputes and material shortages, the 12-mile-long extension through Bergen and Rockland counties opened on August 25, 1957.
EXTENDING NORTH TO THE PALISADES: The Garden State Parkway Extension was to have been part of a "recreation corridor" stretching from the Hudson Valley south to Cape May, New Jersey. In 1946, Robert Moses pitched such a corridor by recommending that an extension of the Garden State Parkway be constructed north to the Palisades Interstate Parkway. This proposal remained on planning maps for many years.
In the late 1960's, the Tri-State Transportation Commission recommended the construction of an extension from the New York State Thruway (EXIT 14A) in Spring Valley north to the Palisades Interstate Parkway (near EXIT 11) in New Square. The extension, which was listed by the Commission as the "NY 45 Expressway," was recommended as a priority project for completion by 1975.
By 1975, the Commission recommended a shift in transportation priorities away from new limited-access highways, and toward more amenable solutions:
Although a limited-access bypass connecting the Garden State and Palisades Interstate parkways no longer seems warranted, studies of smaller-scale improvements should proceed.
Chris Blaney, contributor to nycroads.com and phillyroads.com, provided the following comments on the Garden State Parkway:
My view is the New Jersey Turnpike Authority should be disbanded and the road run by the NJDOT, but the tolls should remain so that the road is self-sustaining, not supported by tax money. Any surpluses that the road generates (especially all the shore traffic that out-of-state motorists, who would normally not contribute to the state's road-building) should go into the NJDOT budget for other needed roadwork in the state. A toll increase can eliminate the need for a gas tax hike, or vice versa.
I would eliminate tolls south of EXIT 38 (Atlantic City Expressway) and north of EXIT 163 (NJ 17), meaning that I would get rid of three out of the 11 mainline toll plazas. In addition, I would eliminate all the ramp tolls that are in place on those areas. Making the eight remaining plazas one-way (either north or south) is a good idea. I would alternate the eight plazas so they'd be south-north-south-north-south-north-south-north. To pay for the cost of eliminating of the three barrier toll plazas, I would make the cash toll 1ドル.00 at each of the remaining plazas, the EZ-Pass peak toll 75 cents and the off-peak EZ-Pass toll 65 cents.
The GSP should be widened to an eight-lane, dual-dual (2-2-2-2) configuration from EXIT 38 (Atlantic City Expressway) north to EXIT 80 (US 9); a ten-lane, dual-dual (3-2-2-3) configuration from EXIT 80 north to EXIT 98 (I-195 / NJ 138); a 12-lane, dual-dual (3-3-3-3) configuration from EXIT 98 north to EXIT 105 (NJ 18 / NJ 35 / NJ 36); and a 14-lane, dual-dual (4-3-3-4) configuration from EXIT 105 to the Driscoll Bridge. The reconstructed Driscoll Bridge should have 16 lanes in a 2-3-3-3-2 configuration, where the outermost lanes would serve EXIT 127 (NJ 440 / I-287) and EXIT 129 (I-95 / New Jersey Turnpike). From EXIT 38 to EXIT 129, the express roadways would have interchanges only at the major locations, with crossovers every 10 to 20 miles.
SOURCES: "New Jersey's First Parkway: Route 4," New Jersey State Highway Department (1947); "Jersey Is Building 300,000,000ドル Road" by Joseph D. Haff, The New York Times (2/26/1953); "Final 4-Mile Link of Jersey Parkway Is Opened" by George Cable Wright, The New York Times (7/02/1955); "Manhattan Bypass Opening" by Joseph C. Ingraham, The New York Times (8/25/1957); "Autobiography of a Parkway," The New York Times (8/02/1964); Transportation 1985: A Regional Plan, Tri-State Transportation Commission (1966); Maintaining Mobility, Tri-State Regional Planning Commission (1975); "HOV Lanes Reach the End of the Road," The Star-Ledger (6/04/1982); The Merritt Parkway by Bruce Radde, Yale University Press (1993); "Palisades Interstate Parkway: National Register of Historic Places Continuation Sheet" by Susan E. Smith and Kathleen LaFrank, Palisades Interstate Park Commission (February 1998); "Plan for Two Increases Over Four Years Includes Big EZ-Pass Discounts" by P.L. Wyckoff, The Star-Ledger (11/19/1999); "Bridge To Reopen Shortly" by Donald Wittkowski, The Atlantic City Press (12/08/1999); "Defeating the Parkway Fines" by Sandra Earley, News 12-New Jersey (1/07/2000); "Authority OK's Fix for Route 78, GSP Interchange" by Doug Most, The Bergen Record (1/21/2000); "Traffic Buildup Slows EZ-Pass Progress at Shore Tolls" by Dore Carroll, The Asbury Park Press (4/07/2000); "The Garden State Parkway: A Case Study in Evaluating the Significance and Integrity of Mid-Twentieth Century Parkways" by Stacy E. Spies, National Trust for Historic Preservation (4/08/2000); "Some SUV's Are Illegal on the GSP" by Paul Mulshine, The Star-Ledger (6/18/2000); "Mixed Review of Parkway Work" by Nick Clunn, The Asbury Park Press (6/21/2000); "Toll-Free Day on Parkway?" by David M. Halbfinger, The New York Times (6/01/2001); "Plan May End Parkway Tolls" by Deborah Yaffe, The Asbury Park Press (8/10/2001); "DiFrancesco Backs Plan To Expand 65 MPH Speed Limit," The Associated Press (8/15/2001); "Driscoll Bridge To Get Second Span" by Lilo H. Stainton, The Courier News (4/09/2002); "Much Faster EZ-Pass Lanes Are Planned at Seven Toll Plazas" by Ronald Smothers, The New York Times (10/31/2002); "Big Changes Down the Road on the Garden State Parkway" by Kemberly Richardson, WABC-TV (5/06/2004); "Parkway Upgrades Traveling in Fast Lane" by Daniel Sforza, The Bergen Record (12/19/2004); "N.J. Looking into Selling Toll Roads To Get Cash" by Jennifer Moroz, The Philadelphia Inquirer (1/25/2005); "One-Way Tolls To Be Added to Parkway" by Jennifer Moroz, The Philadelphia Inquirer (3/30/2005); "Widening of Parkway Is Planned on Jersey Shore" by Iver Peterson, The New York Times (5/12/2005); "In Toll-Road Talk, Visions of Easy Cash" by Jennifer Moroz, The Philadelphia Inquirer (4/05/2006); "For Some, New Driscoll Span Opens Today," The Star-Ledger (4/10/2006); "Speeds Drop on Garden State Parkway," WABC-TV (2/29/2008); "Driscoll Bridge Work Is On Pace for 2009 Finish" by Sue Epstein, The Star-Ledger (7/26/2008); New Jersey Highway Authority; North Jersey Transportation Planning Authority; Tri-State Transportation Campaign; Chris Blaney; Anita Bonita; Sean Carolan; Phil Case; J.P. Cloninger; Rich Dean; Jay Delgado; Patrick Donnelly; David Jackino; Bryan Katz; Ayan R. Kayal; Raymond C. Martin; Christopher G. Mason; Earle Meyer; Dan Moraseski; Guy Olsen; Jim Padykula; Nathan W. Perry; Brian Polidoro; Sandy Smith; Jeff Taylor; William F. Yurasko.
GARDEN STATE PARKWAY LINKS:
GARDEN STATE PARKWAY LINKS:
GARDEN STATE PARKWAY CURRENT CONDITIONS:
OFF-SITE EXIT LISTINGS:
VIEW OR SUBMIT YOUR RATING TO RATETHEROADS.COM:
Back to The Roads of Metro New York home page.
Back to The Roads of Metro Philadelphia home page.
Site contents © by Eastern Roads. This is not an official site run by a government agency. Recommendations provided on this site are strictly those of the author and contributors, not of any government or corporate entity.