LATEST PRESS RELEASE
Divertion of PRASANTI Express, Chennai Asansol Superfast Express, Falaknuma Superfast Express, Partial Cancellation of Machilipatnam / Narasapur Visakhapatnam Passenger & Special Trains run by ECoR
Trains Cancelled / Partially Cancelled / Diverted / Rescheduled due to overflowing of rain water above danger level at a Railway Bridge on Thandava River between Tuni-Gullipadu
More Helpline Numbers Provided for Public Information In view of Changes In Train Services
Steps Taken by SCR to Minimise Inconvenience to Passengers in View of Disruption to Train Services Between Vijayawada and Visakhapatnam Due to Heavy Floods
Alleppy-Dhanbad, Nagavali, & Yesvantapur Hatia Express Diverted Due to flowing of Water over Railway Bridge Between Tuni and Gullipadu Section
Trains Diverted Due to flowing of Water over Railway Bridge Between Tuni and Gullipadu Section
Santragachi-Chennai-Santragachi Special Train Extended for Eight more Services
SCR Extends Secunderabad-Jaipur-Secunderabad Special Train For Eight more Services
SCR Observes ‘Vigilance Awareness Week’
KAKINADA PORT CHENNAI EGMORE CIRCAR EXPRESS TO STOP AT MANGALAGIRI AND TIRUPATI AMARAVATHI EXPRESS TO STOP AT MADANAPALLI ROAD
Machilipatnam-Yesvantapur Express to stop at Narasaraopet
Special Trains between Visakhapatnam Secunderabad, Karimnagar Tirupati, Visakhapatnam Shiridi Sai Nagar, Visakhapatnam Chennai and Indore Yesvantapur
Tirupati Karimnagar Express Inaugurated and Jammikunta Adarsh Station Inaugurated
Trains Cancelled / Partially Cancelled / Diverted / Regulated Due to Road Under Bridge Work in Nanded Division
Special Ticket Checking Drives conducted by Secunderabad Division
A/C Special Trains Between Kakinada Town and Secunderabad Via Tanuku, Bhimavaram, Gudivada
SCR sets up Exclusive Contact Numbers for Fire Prevention Alert
Cancellation of Trains Due to Track Maintenance Works On Tirupati-Renigunta-Gudur Section
Monthly Combined MMTS / APSRTC Ticket Fares to be Increased
Special Trains Between Secunderabad-Tirupati and Tirupati-Karimnagar
South Central Railway to Run Fourteen Dussera / Diwali Special Trains Between Nanded and Surat
Six Special Trains between Chennai and Shalimar Via Gudur, Vijayawada and Visakhapatnam
Two Special Trains Between Bangalore and Santragachi
Twelve Super Fast Deepawali AC Special Trains Between Secunderabad and Mumbai LTT
“Science Express-Biodiversity Special-Fifth Phase” To Put Up Exhibitions on SCR
Eighteen Special Trains Between Jammu Tawi and H.S.Nanded
Eight Superfast Special Trains Between Visakhapatnam and Sainagar Shirdi
Levy of Service Tax on AC and First Class Rail Passengers from 1st October 2012
Levy of Service Tax on Transportation of Goods by Rail from 1st October 2012
Twenty Eight Special Trains Between Visakhapatnam and Nanded Via Vijayawada
Dismantling of Staircases on Platforms of Secunderabad Railway Station for Installation of Escalators
Miraj-Parli Vaijnath Passenger Train Derailed Between Ghatnandur and Parli Vaijnath Stations
SCR to revise the Timings of 77687 Nizamabad-Kacheguda DEMU Passenger, 77614 Manoharabad-Secunderabad DEMU Passenger, 77688 Kacheguda-Nizambad DEMU Passenger, 77615 Secunderabad-Medchal DEMU Passenger & 57473 Kacheguda- Bodhan Passenger
SCR to revise the Timings of Secunderabad-Pune Shatabdi Express
SCR to Run Twelve Special Express Trains For Diwali Festival between Hyderabad - Visakhapatnam, Hyderabad - Santragachi, Aurangabad - Tirupati And Kacheguda - Bangaluru
SCR to run eight MMTS Special Trains on 29th and 30th September 2012 for Vinayaka Nimarjanam
SCR to revise the Timings of Gulbarga – Hyderabad Passenger Train
SCR To Run Four Special Trains Between Hyderabad and Santragachi during Dussehra Season
Sri K.H. Muniyappa, Hon’ble Minister of State for Railways Flags off New Intercity Express Between Bidar and Hyderabad
Fare of Secunderabad-Visakhapatnam Duronto Express Does not Include Catering Charges
Train Services Cancelled on 4th September 2012
Rejoinder / Clarification on News Items on the Incident Involving Rajdhani Express Near Adoni on 24th August, 2012
Cancellation / Partial Cancelation of Trains Due to Track Maintenance Works on Vijayawada-Rajamundry-Kakinada and Vijayawada-Ongole-Gudur Sections
Cancellation / Short Termination / Rescheduling / Partially cancellation / Running of Special Services Due to Line Block Between Hussain Sagar and Secunderabad / Hyderabad due to Track Improvement Works
High Level Coordination Meeting Between SCR, GHMC, and HMRL Held on Various Developmental Works
SCR Introduces Token System at Passenger Reservation System Office at Secunderabad
SCR To Run Ten Special Trains Between Kacheguda And Banglore, Hyderabad And Visakhapatnam & Aurangabad And Tirupati
Surprise Check Against Ticketless Travel at Secunderabad Railway Station
South Central Railway to run special Trains between Hyderabad –Kollam-Hyderabad
South Central Railway extends the run of Jaipur-Secunderabad-Jaipur Special Train
Singareni Collieries Company Limited Pays Rs. 6.38 Crores to S.C.Railway for the Bhadrachalam Road – Sattupalli New Railway Line
SCR to Run Ten Special Trains Between Hyderabad – Kolhapur – Hyderabad
SCR Releases MMTS-Cum-Local Trains Pocket Time Table
Asanlol-Chennai Central Weekly Express introduced
TIME LINE AND MILESTONES OF EVENTS (SCR)
TIME LINE AND MILESTONES OF EVENTS (SCR)
DATE
MONTH
YEAR
EVENT
1874
Wadi -
Secunderabad Railway Line & Secunderabad Railway Station built by
Nizam's Guaranteed Railway
1884
Hospet
- Bellary Railway Line opened by Southern Mahratta Railway Co.
1888
Vijayawada station was constructed when
Southern Mahratta Rly's main Eastward Route Connected with other lines
going towards Vijayawada
1889
Nizam's State Railway Mainline extended upto Vijayawada Junction
1890
Goa To
Guntakal MG line Construction completed by Southern Mahratta Rly Co.
with Branch Line From Vijayawada to Marmagoa
1897
First
Godavari Bridge Built over River Godavari from Kovvur to Rajahmundry
1
Nov
1899
Opening of through BG connenction between Vijayawada and Chennai
(Madras)
1900
Secunderabad - Manmad MG line opened by Hyderabad Godavary Valley
Railway
15
Aug
1900
Howrah
- Chennai (Superfast) Mail was introduced (Via Eluru, Vijayawada)
1916
Guntur - Repalle BG line
(Constructed by the Madras and Southern Mahratta Railway) was opened
1916
Kacheguda Station Built by Nizam of Hyderabad
1929
Kazipet - Balharshah Link Completed, Providing direct Connection From
Delhi to Vijayawada
1930
Guntur - Macherla MG line was opened
1930
Grand
Trunk Express introduced between New Delhi and Chennai (Via Vijayawada)
23
Aug
1957
Gudur
- Renigunta BG line opened to Traffic
01
April
1965
Chennai - Hyderabad Express (Now running via Tenali, Guntur) Introduced
01
Oct
1966
BG Line between Vijayawada and
Guntur open for Traffic
02
Oct
1966
South
Central Railway was formed by grouping Vijayawada and Hubli Divisions of
Southern Railway and Secuderabad and Solapur Division of Central Railway
1967
Circar Express introduced between
Kakinada Port and Chennai (Via Bhimavaram, Vijayawada)
1968
Rail
Nilayam, Secunderabad, the Land Mark Building housing Zonal Head Quarter
Office of South Central Railway was inaugurated with ground floor to
third floor
1969
Golconda Express Introduced between Vijayawada & Secunderabad as the
fastest Steam Hauled Train in the Country
05
April
1970
Tirumala Express Introduced between Vijayawada and Tirupati and later
Extended to Kakinada and finally cancelled between Samarlakota and Kakinada and extended to Visakhapatnam
1972
Construction of Rail Nilayam, Secunderabad, fully completed
01
Feb
1974
Godavari Express Introduced between Visakhapatnam and Hyderabad
07
April
1974
Foundation Stone laid by the then
Prime Minister of India - Smt Indira Gandhi, for the 152 kms long
Bibinagar - Nadikudi rail Project
20
Nov
1974
2nd
Godavari Bridge (rail cum road Bridge) over the River Godavari was
commissioned by His Excellency President of India Sri Fakruddin Ali
Ahmed
1974
Wagon
Workshop at Guntupalli near Vijayawada was Inaugurated
16
May
1975
East
Coast Express introduced between Vijayawada and Howrah
1975
First
Plassur Quick Relaying System (PQRS) for mechanized laying of track
introduced
Jan
1976
First
Route Relay Interlocking (RRI) System of SCR was commissioned at
Vijayawada Station
07
Aug
1976
Tamil
Nadu Superfast Express Introduced between Chennai And New Delhi (Via
Vijayawada)
03
Oct
1976
Andhra
Pradesh Superfast Express Introduced between Hyderabad and New Delhi
(Via Kazipet)
16
Feb
1977
Chennai - Varanasi Ganga Kaveri Express Introduced (Via Vijayawada)
06
Mar
1977
Coromandel Superfast Express Introduced between Howrah and Chennai (Via
Eluru, Vijayawada)
Oct
1977
Merging of Guntakal Division of Southern Railway with South
Central Railway and transferring Solapur Division back to Central
Railway
Feb
1978
Secunderabad Division was split into Secunderabad and Hyderabad
Divisions to facilitate effective Operational and administrative Control
06
April
1978
Navajivan Express introduced between Chennai and Ahmedabad
16
Aug
1978
Konark
Expess introduced between Bhubaneswar and Secunderabad (Via Eluru,
Vijayawada)
01
Oct
1979
Hyderabad Narasapur Express introduced (Via Vijayawada)
Oct
1979
First
Ever Microwave Lab on Indian Railways was Commissioned at Secunderabad
April
1980
Electric Loco Shed, Vijayawada was inaugurated with a capacity to
maintain 100 Electric Locos
15
Dec
1980
First
Electrified Route From Vijayawada To Gudur was inaugurated
Jan
1981
First
Tie Tamping Machine in SCR was Introduced
26
Jan
1983
Newly
Laid BG line between Gooty and Dharmavaram was opened for Traffic
Sept
1985
Carriage Repair Shop, Tirupati with a capacity to overhaul 100 BG
Coaches was Commissioned
01
Oct
1985
Link (Superfast)
Express Inaugurated between Visakhapatnam & H. Nizamuddin
01
April
1987
Ernakulam Guwahati Express introduced first between Cochin Harbour (T)
and Guwahati (Via Eluru, Vijayawada)
03
Oct
1987
Gowthami Express Introduced between Kakinada Port and Secunderabad (Via
Eluru, Vijayawada)
Nov
April 1987
1988
1989 Newly Laid BG line between Bibinagar and Nadikudi was opened for traffic in 3 phases
01
May
1988
Andaman Express Introduced between Chennai and Jammu Tawi (Via
Vijayawada)
July
1988
First
Digital Electronic Exchange was introduced at Rail Nilayam, Secunderabad
30
Sept
1989
SCR
introduced Computerised Passenger Reservation System / CRPS at
Secunderabad Railway Station
1990
Navayug Express Introduced between
Jammu Tawi and Mangalore (Via Vijayawada) and also a link to
Tiruchchirappalli (Via Vijayawada)
May
1990
First
Ballast Cleaning Machine in SCR was introduced
1991
Samata Express was introduced
between Visakhapatnam and H. Nizamuddin
1991
Puri - Tirupati Express Introduced
(Via Bhimavaram Town, Vijayawada)
1991
Tirupati - Mysore Fast Passenger
introduced as Express
1992
Satavahana Express introduced
between Vijayawada and Secunderaabd (Via Kazipet)
1992
Passenger introduced between
Secunderabad and Bhadrachalam Road
1992
Mumbai LTT (Lokamanya Tilak T) -
Coimbatore Express introduced between Lokamanya Tilak T and Bangalore
City
1992
Rajdhani Superfast Express
introduced between H. Nizamuddin and Bangalore (Via Secunderabad,
Guntakal, Dharmavaram)
01
July
1992
Pinakini (Superfast) Express introduced between Vijayawada and Chennai
(Via Tenali )
1993
Secunderabad - Mahabubanagar MG Section Converted to BG
1993
Rajdhani Superfast Express
Introduced between H. Nizamuddin and Chennai (Via Vijayawada)
1994
Nagarjuna Express introduced
between Secunderabad and Guntur (Via Piduguralla)
1994
Trivandrum - Mumbai Express (Via
Dharmavaram, Guntakal) introduced
July
1994
First
Solid State Interlocking or Electronic Interlocking System was
Commissioned at Kavali / KVZ Station
02
Oct
1994
Ratnachal (Superfast) Express introduced between Vijayawada and
Visakhapatnam (Via Eluru, Rajahmundry, Samarlakota)
14
Oct
1994
Foundation Stone Laid for the
construction of Bogada Tunnel on Giddalur - Nandyala Section
1995
Tirupati - Hubli Intercity
Passenger Introduced between Tirupati and Kadapa as an Express
1995
Nagercoil - Mumbai Express (Via
Dharmavaram, Guntakal) introduced
May
1995
SCR
introduced 5,000 HP Electric Locos for Passenger Trains
01
July
1995
Amaravathi Express Introduced between Vijayawada & Vasco
Sept
1995
Electric Loco Shed, South Lallaguda with a capacity to maintain
100 Electric Locos was inaugurated
30
Nov
1995
Andhra
Pradesh Superfast Express was augmented with 24 Coaches, followed by
Charminar Express, Godavari Express, Pinakini Express
1995
Gauge
Conversion work of Donakonda - Giddalur Section Completed
1996
Jaipur - Chennai Express (Via
Vijayawada) Introduced
May
1996
Mango
specials i.e Goods Trains with Mango Loads were first introduced by SCR
01
Sept
1996
First
Diesel Multiple Unit (DMU) on SCR was introduced between Vijayawada and
Machilipatnam
01
Sept
1996
First
Main Line Electric Multiple Unit (MEMU) on SCR was introduced between
Vijayawada & Ongole
Sept
1996
First
Long Haul Digital Microwave Link of SCR was commissioned on Vijayawada -
Gudur - Renigunta Sections
1997
Swarna Jayanti Express (Via
Vijayawada) introduced between Ernakulam and H. Nizamuddin
11
Mar
1997
Third
Godavari Bridge (Bow String Concrete Structure) built
over River Godavari from Kovvur to Godavari stations was commissioned to
traffic
28
Oct
1997
Swarna
Jayanti Express Introduced between Visakhapatnam and H. Nizamuddin (Via
Eluru, Vijayawada)
14
Oct
1997
Computerised Passenger Reservation System, Secunderabad was linked with
Passenger Reservation System of New Delhi
1998
Kacheguda - Chittoor Venkatadri
Express was introduced between Secunderabad and Tirupati (Via Kurnool
Town)
1998
Haripriya Express (Via Guntakal)
introduced between Kolhapur and Tirupati
1998
Palnadu Express introduced between
Guntur and Secunderabad (Via Piduguralla)
31
Mar
1998
Interactive Voice Response System (IVRS) for dissemination of
information on Reservation Status and Accommodation Availability was
First introduced at PRS Office, Secunderabad with 12 Lines and later
extended to 16 lines
Mar
1998
Railnet was commissioned at SCR
April
1998
First
Mobile Police Station was introduced by Hyderabad - Tirupati Narayanadri
Express
19
July
1998
Computerized Passenger Reservation System, Secunderabad was linked to
PRS / Howrah
July
1998
SCR
introduced 5,000 HP Electric Locos for Goods Transport
21
Aug
1998
Prasanti Express introduced between Visakhapatnam and Bangalore City
(Via Eluru, Vijayawada, Guntur, Guntakal)
31
Jan
1999
Computerized Passenger Reservation System, Secunderabad was linked to
PRS / Mumbai (CST)
1999
Passenger Train Introduced between
Raichur and Gulbarga
1999
Coimbatore - H. Nizamuddin Express
Introduced (Via Dharmavaram)
1999
Mysore Superfast Express
introduced between Jaipur and Bangalore City (Via Secunderabad)
1999
Chennai Egmore - Guwahati Express
(Via Vijayawada, Eluru) Introduced
Mar
1999
Wagon
Workshop, Guntupalli was granted ISO 9002 Certificate
May
1999
Carriage Repair Shop, Tirupati was granted ISO 9002 Certificate
18
April
1999
Computerized Passenger Reservation System, Secunderabad was linked to
PRS / Chennai
30
June
1999
National Train Enquiry Terminal (NTES) was introduced at Secunderabad
31
Aug
1999
Machilipatnam Express Introduced between Secunderabad and Machilipatnam
(Via Vijayawada)
31
Dec
1999
Passenger Operated Enquiry Terminal (POET) was introduced in
Secunderabad Station
1999
Walkie-Talkie
Wireless set for communication between Driver-Guard –Station Manager
introduced in SCR
1999
High
powered Diesel Loco with 4000 hp capacity introduced for hauling Goods
Trains
2000
Kakinada Town - Manmad Express
Introduced
2000
Balaji Express Introduced between
Tirupati and Nagercoil
2000
Lokamanya Tilak {T} - Madurai
Express introduced
Jan
2000
First
Solar Power Colour Lights on SCR was provided at LC Gate no. 55 near
Gudivada Station of Vijayawada Division
Jan
2000
First
LED lit colour light signal on SCR was provided at LC 404 at KM
589/14-16 between Kadiyam-Dwarapudi Station on Vijayawada–Visakhapatnam
Section
April
2000
ISO
Certificate 9002 was granted to Carriage Workshop, Lallaguda
April
2000
Escalator for climbing on Foot Over Bridge connecting platforms was
commissioned at Vijayawada station
2001
Shalimar - Nagercoil Gurudev
Express introduced between Howrah and Nagercoil (Via Eluru, Vijayawada)
2001
Chennai Egmore - Jodhpur Express
(Via Vijayawada) introduced
2001
Pendekallu-Gooty branch line
opened
2001
State
of the art high powered Diesel Loco with a capacity of 4000 hp was
introduced for hauling Passenger trains
Jan
2001
High
speed Data Channel Net working for Freight Operation Information System
(FOIS) was commissioned in SCR
11
May
2001
Foundation Stone Laid for restoration of the historic Kakinada-Kotipalli
line at the Kotipalli railway station
31
June
2001
Coaching Refund was first computerized for Hyderabad Narasapur Express
2002
Thirukkural Express introduced
between H. Nizamuddin and Kanniyakumari (Via Vijayawada)
2002
Wain Ganga Express introduced
between Durg and Yesvantapur (Via Dharmavaram)
15
Jan
2002
Howrah
Yesvantapur Express was introduced (Via Eluru, Vijayawada, Tenali)
Jan
2002
First
station in South Central Railway to be commissioned with all Light
Emiting Diode (LED) lit CLS is Kovvur
12
Feb
2002
Secunderabad - H. Nizamuddin Rajdhani Superfast Express introduced
02
July
2002
Nanded
- Pune Triweekly Express introduced
04
July
2002
Chennai - Visakhapatnam Weekly Express Introduced (Via Vijayawada, Eluru)
06
Sept
2002
Rake
Management System, to monitor the movement of rakes and Wagons (a
division of Freight Operation Information system) was first introduced
at Gooty and Renigunta stations
09
Nov
2002
Padmavati Express Introduced
between Secunderabad and Tirupati (Via Vijayawada)
16
Nov
2002
First
Diesel Engine with AC Cabin for Driver was introduced in SCR
24
Dec
2002
Seshadri Express Introduced between Kakinada and Tirupati (Via
Rajahmundry, Bhimavaram Town, Akividu, Vijayawada)
2003
Anti-collision device was fitted to Locomotives running on
Renigunta-Guntakal route of Guntakal Division on an experimental basis
Mar
2003
First
ISDN compatible electronic exchange of SCR was commissioned at
Secunderabad
23
Mar
2003
Nagavali Express introduced
between Sambalpur and Nizamabad (Via Eluru, Vijayawada)
01
April
2003
Guntur Division is formed as a New
Division in SCR
30
June
2003
Laying
of Optic Fibre Cable on all important routes of SCR was Completed by
Railtel Corporation
July
Aug 2003 707 Special trains for Godavari Puskarams, moved 22,84,170 pilgrims and earned Rs.4.28 Cr.
Aug 2003 707 Special trains for Godavari Puskarams, moved 22,84,170 pilgrims and earned Rs.4.28 Cr.
09
Aug
2003
Multi
Model Transport System (MMTS) with EMU Rake was inaugurated between
Secunderabad-Lingampalli section
30
Sept
2003
Terminal Management System a division of Freight Operations Information
System (FIOS) was first introduced on SCR at Bellampalli Station
04
Oct
2003
Issue
of “Railway Receipt” for booking of freight (under terminal Management
system) was computerized first at Bellampalli station
Jan
2004
First
ever “Block Proving” by Digital Axle Counter System in Indian Railways
was energized at Bhimadolu – Pulla block section on
Vijaywada-Visakhapatnam route
22
Jan
2004
Muzaffarpur - Yesvantapur Express
Introduced (Via Eluru, Vijayawada)
14
Feb
2004
Multi
Model Transport System (MMTS) Train between Secunderabad – Falaknuma
inaugurated
16
Mar
2004
Signal, Telecommunication, Carriage, Stores Finance and Store Bills
wings of the office of Chief Controller of Stores, Rail Nilaym,
Secunderabad were granted ISO 9001/2000 certificate
18
Mar
2004
Office
of Senior Divisional Financial Advisor’s Office was granted ISO
9001/2000
03
April
2004
First
Refrigerated Parcel Van service was inaugurated between Vijayawada and
Guwahati by Bangalore-Guwahati Express
May
2004
SCR
realized the highest earnings of Rs.2.18 Cr from 2.72 lakh ticketless
Passengers
30
June
2004
Last MG train on Nizamabad -
Manoharabad Section operated, bringing an end to the MG services on the
route
July
2004
Usage of Aerodynamically Designed
DEMU rakes by ICF, begins for the first time in SCR
13
Nov
2004
Kakinada Town - Kotipalli Newly Laid BG line was inaugurated at
Kotipalli Station by the Union Minister of State for Railways, Sri. R.
Velu
01
July
2005
Secunderabad - H. Nizamuddin Andhra Pradesh Sampark Kranti Superfast
Express Extended to Tirupati (Via Kurnool Town, Dhone, Pendekallu, Gooty)
01
July
2005
Krishna Express Extended upto Nizamabad via Secunderabad
01
July
2005
Kacheguda - Yesvantapur (Prasanti Nilayam Express) introduced (Via
Guntakal, Dharmavaram)
01
July
2005
Tirupati Howrah Express Cancelled between Khurda Road and Howrah (due to
poor patronage) and re-routed to Puri
01
July
2005
Dadar
- Chennai Egmore Express (Via Guntakal, Gooty, Renigunta) upgraded to
Superfast Category
03
July
2005
Tirupati - Bilaspur Biweekly Express Introduced (Via Vijayawada, Akividu,
Bhimavaram Town, Rajahmundry)
27
Oct
2005
Simhapuri Superfast Express introduced between Gudur and Secunderabad
(Via Tenali, Vijayawada)
26
Feb
2006
Kacheguda - Chennai Egmore Express (Via Kurnool, Dhone, Pendekallu,
Gooty) introduced between Secunderabad and Chennai Egmore
02
Oct
2006
SCR completes 40 Successful years
since its formation on Oct 2 1966
07
Nov
2007
High Speed Goods Train "Himalaya
Special" introduced from Secunderabad. The new Train was expected
to run a 100 Kmph Speed intending for speedy transportation of Goods
such as Coal
26
Dec
2007
Karimnagar - Lingampet Jagityal BG
line Inaugurated
03
Feb
2008
Garib Rath Superfast Express
introduced between Secunderabad and Yesvantapur (Via Vikarabad, Guntakal,
Kalluru, Dharmavaram)
26
Oct
2008
Garib Rath Express Introduced between
Visakhapatnam and Secunderabad (Via Eluru, Vijayawada)
28
Nov
2008
Machilipatnam - Yesvantapur Triweekly
Express Introduced (Via Vijayawada, Guntur, Pendekallu, Gooty,
Dharmavaram)
2009
Hyderabad Division became first
division in SCR to have LED based Color Light Signals at all the
stations for all signals.
04
Feb
2010
Frequency of Visakhapatnam -
Secunderabad Garib Rath Superfast Express (Via Eluru, Vijayawada)
increased from 4 days a week to Daily
04
Feb
2010
Frequency of Secunderabad - Patna
Superfast Express (Via Kazipet) increased from biweekly to Daily
29
June
2010
Newly Converted Pakala - Dharmavaram
BG line opened for Traffic
29
June
2010
Passenger Train introduced between
Tirupati and Guntakal (Via Pakala, Dharmavaram, Kalluru) on the newly
converted BG line
22
July
2010
Delinking of Nanded - Bangalore Hampi
Link Express and Hubli - Bangalore Hampi Express which used to run as
combined trains
Aug
2010
Secunderabad / Vijayawada / Kakinada
Town - Manmad Express trains get Extended upto Sainagar Shiridi
01
Sept
2010
Foundation Stone Laid for Kadapa -
Bangalore Line at Kadapa Station
19
Sept
2010
Solapur - Raichur and Raichur -
Gulbarga Passenger trains get Extended upto Guntakal
20
Sept
2010
Tenali - Donakonda and Donakonda -
Guntur Passenger Trains get extended upto Markapur Road
27
Sept
2010
Hyderabad - Ajmer Biweekly Superfast
Express Flagged off
27
Sept
2010
Kacheguda - Miryalaguda DEMU
passenger and Kacheguda - Mahbubnagar DEMU passenger Flagged off
01
Oct
2010
Frequency of Yesvantpur - Korba Wain
Ganga Superfast Experss (Via Dharmavaram, Gooty, Pendekallu, Kurnool
Town, Kacheguda) increased from Weekly to Bi weekly
14
Oct
2010
Circular MEMU Train Services Between
Vijayawada – Guntur – Tenali Introduced
22
Nov
2010
SCR’s First Mechanised Laundry Plant
Installed at Kacheguda
15
Dec
2010
Bapatla Stop provided for Chennai -
New Delhi Grand Trunk Superfast Express
24
Dec
2010
Mechanized Laundry Plant
Commissioned at Secunderabad Railway Station
26
Jan
2011
Secunderabad-Tirupati Bi-weekly
Express (via. Vikarabad, Guntakal, Dharmavaram, Pakala) flagged off
26
Jan
2011
Secunderabad-Manuguru Tri-weekly
Superfast Express flagged off
26
Jan
2011
Kacheguda-Akola Express, extended
from Nanded to Akola
15
Feb
2011
Delinking of Tirupati - Hyderabad
Rayalaseema Express and Tirupati - Kolhapur Haripriya Express which were
running as combined train upto Guntakal
18
Feb
2011
Hyderabad-Kolhapur Bi-weekly Express
introduced
19
Feb
2011
Howrah - Sri Satya Sai Prasanti
Nilayam Superfast Express (Via Eluru, Vijayawada, Guntur, Pendekallu,
Dharmavaram) introduced
22
Feb
2011
Secunderabad - Mumbai LTT Duronto
Superfast Express (Via Vikarabad, Tandur) introduced
24
Feb
2011
Bhubaneswar - Pune Superfast Express
(Via Eluru, Vijayawada, Guntur) introduced
March
2011
South Central Railway established
computerized Passenger Reservation Systems at 333 stations / locations
including Post Offices by March, 2011
March
2011
South Central Railway has laid 446.28
km of new lines since its inception in the 1996 till March, 2011
March
2011
South Central Railway was converted
3601.50 Rkm of MG track to broad gauge since its inception in the year
1966 till March, 2011
March
2011
South Central Railway has carried out
Doubling of track to the extent of 1483.25 RKm since its inception in
the year 1966 till March, 2011
March
2011
South Central Railway had electrified
2024 Rkm, since its inception in the year 1966 till March, 2011
17
May
2011
Santragachi - Tirupati Weekly
Superfast (Via Eluru, Vijayawada) Introduced
06
June
2011
Frequency of Secunderabad - Bikaner
Express increased from weekly to bi weekly
01
July
2011
Sambalpur - Nizamabad Nagawali
Express (Via Eluru, Vijayawada) extended upto Nanded
02
July
2011
Visakhapatnam - Nizamabad Express
(Via Eluru, Vijayawada) extended upto Nanded
03
July
2011
New Delhi - Puducherry Superfast
Express (Via Vijayawada) introduced
06
July
2011
Chennai - Sai Nagar Shiridi Superfast
Express (Via Dharmavaram, Kalluru, Guntakal, Adoni) Introduced
07
July
2011
Hyderabad - Dharabanga Express (Via
Kazipet) introduced
13
Nov
2011
Secunderabad- Pune-Secunderabad
Shatabdi Superfast Express flagged off
14
Nov
2011
Miryalaguda-Kacheguda-Miryalaguda
DEMU Passenger & Miryalaguda-Nadikudi-Miryalaguda DEMU Passengers
Introduced
15
Nov
2011
Gorakhpur - Yesvantapur Express (Via
Kacheguda, Kurnool, Pendekallu, Gooty, Dharmavaram) introduced
18
Nov
2011
Dwaraka - Tuticorin Express
Introduced (Via Guntakal, Dharmavaram)
26
Nov
2011
Kanniyakumari - Dibrugarh Express
(Via Vijayawada, Eluru) introduced
09
Dec
2011
New Domestic Container Terminal of
CONCOR inaugurated At Nagalapalli
13
Dec
2011
Tirupati - Amaravati Biweekly
Superfast Train Introduced (Via Pakala, Dharmavaram, Gooty, Pendekallu,
Kurnool, Kacheguda)
26
Dec
2011
Kakinada Port New Railway Station
near Sambamurthy Nagar was Inaugurated
Disclaimer - Any information provided on this site is always liable to change.